THE WORK, EXPLAINED
Start with the condition.
Understand the scope.
Identify the required door arrangement and confirm which leaf will normally operate. Ask the provider to specify the frame, threshold, meeting-edge hardware and lockset, together with the removal and finishing scope. Have the proposal explain how alignment and the operation of both leaves will be checked and how additional opening repairs would be handled.
What may be involved
- prehung French door pair
- astragal
- hinges
- flush bolts
- lockset
- threshold
- flashing
- casing
Ask the provider to distinguish existing parts to inspect, proposed replacements, and tools, materials or reports included in the service. Confirm the work and exclusions after assessment; this list does not mean that every item will be supplied or replaced.
LOCAL RESEARCH / Miami
Local context
The City of Miami's permit guide says that Florida requires permits for many types of construction and remodelling projects, including a new building, an expansion, improvements or repairs, especially where plumbing, electricity, gas or structural work is involved, and that even smaller jobs such as changing windows, doors or siding often need a permit. Use it as a starting point for a City of Miami address. Neighbourhood names do not always follow city limits, so confirm which building department covers your address before anyone applies on your behalf.
Source ↗Area-wide context does not establish the condition of your property or equipment.
Before the visit
Identify the affected opening and describe the symptom. Gather available product labels and previous work records. Explain access restrictions and keep the opening clear.
Service illustration · not a completed customer project

